| 225 | 7 | 13 |
| Downloads | Citas | Reads |
The reservoir basin filling project of the upper reservoir of a pumped storage power station has a huge volume of 11.24 million m3.The geological conditions of the reservoir dam foundation and the lithology of the filling material source are complex.Whether the geomembrane at the bottom of the reservoir can adapt to the large local deformation gradient at the anchorage is one of the key technical problems affecting the anti-seepage reliability of the reservoir basin.To solve this problem,this paper studies the local deformation adaptability of geomembrane based on submodel method.Through the comparison and of multiple schemes,combined with the specific characteristics of the project,this study studies and determines the scheme and specific size of the local adaptive deformation measures,which can provide guidance or reference for the construction of similar projects.
[1]吴关叶,黄维,王樱畯,等.抽水蓄能电站水库防渗技术[M].北京:中国水利水电出版社,2020.
[2]束一鸣,陆忠民,侯晋芳,等.土工合成材料防渗排水防护设计施工指南[M].北京:中国水利水电出版社,2020.
[3]尚层,李玉建,徐千军,等.复合土工膜不同锚固型式对膜应力变形的影响研究[J].中国农村水利水电,2012,4(10):72-75.
[4]卢力,贾林.某抽水蓄能电站水库土工膜防渗体系渗漏修复措施探讨[C]//抽水蓄能电站工程文集,2019.
[5]王永明,邓渊,任金明,等.高土石围堰复合土工膜应变集中计算方法研究[J].岩石力学与工程学报,2016,35(增刊1):3299-3307.
[6]张岚,单海年,潘琳.某大型抽水蓄能电站上水库初蓄期安全运行性态分析[J].水电能源科学,2019,37(9):55-58.
[7]束一鸣,吴海民,姜晓桢,等.高面膜堆石坝周边的夹具效应机制与消除设计方法[J].水利水电科技进展,2015,35(1):10-15.
[8]宁宇,喻建清,崔留杰.软岩堆石高坝土工膜防渗技术[J].水力发电,2016,42(5):62-67,105.
[9]李佳男,赖国伟,王义鹏.基于子模型的高面板堆石坝周边缝变形分析[J].水电能源科学,2014,32(8):81-84,55.
Basic Information:
DOI:10.20040/j.cnki.1000-7709.2021.10.032
China Classification Code:TV223;TV743
Citation Information:
[1]WANG Ying-jun,LEI Xian-yang,JIANG Xiao-zhen ,et al.Study on Local Adaptability of Geomembrane Anchorage in Reservoir Basin of Pumped Storage Power Station Based on Submodel Method[J].Water Resources and Power,2021,39(10):131-134.DOI:10.20040/j.cnki.1000-7709.2021.10.032.
Fund Information:
国家自然科学基金项目(51509165)
2021-01-12
2021
2021-01-29
2021
2021-07-20
1
2021-10-25
2021-10-25