To solve the problem that temperature cracks appear easily on lining concrete construction in summer of the large section tunnel.Taking Xiluodu hydropower station diversion tunnel for an example,ANSYS finite element simulation software is used to analyze the temperature control effect in different pouring ways under different conditions,and the reasonable temperature control program is given.The results show that pouring whole in one time can not prevent temperature cracks;the temperature changes little that pouring whole in twice time,but the maximum tensile stress of the representative points is reduced effectively,especially the first main stress of the middle point in lining concrete,which meets the requirements of prevention cracks for lining concrete.So,the lining concrete can prevent temperature cracks as the specification claim with the later pouring way,as well as there is no more excess security and it is relative economic.
[1]叶明,聂文俊.溪洛渡水电站左岸导流洞混凝土施工[J].四川水力发电,2007,26(1):18-21.
[2]樊航三,周飞,吴亮.溪洛渡水电站导流洞底板混凝土防裂试验研究[J].四川水力发电,2007,26(1):71-74.
[3]沈岚.溪洛渡水电站右岸导流洞混凝土衬砌的施工方法.[J].红水河,2007,26(1):150-152,155.
[4]谭华,胡浩,王景梅.溪洛渡水电站右岸导流洞混凝土衬砌施工技术[J].水力发电,2008,34(9):66-68.
[5]郭杰,段亚辉.溪洛渡水电站导流洞不同厚度衬砌混凝土通水冷却效果研究[J].中国农村水利水电,2008(12):119-122.
[6]吴家冠,段亚辉.溪洛渡水电站导流洞边墙衬砌混凝土通水冷却温控研究[J].中国农村水利水电,2007(9):96-99.
[7]王焕.尾水隧洞衬砌混凝土裂缝预防及治理[J].岩土力学,2000,25(S):154-156.
[8]梁倩倩,段亚辉.江萍河水电站有压放空洞衬砌混凝土温控研究[J].水电能源科学,2011,29(5):89-92.
Basic Information:
DOI:10.20040/j.cnki.1000-7709.2013.03.024
China Classification Code:TV554.14
Citation Information:
[1]ZOU Kaifang,DUAN Yahui(State Key Laboratory of Water Resources and Hydropower Engineering,Wuhan University,Wuhan 430072,China).Study of Effect of Thermal Control on Lining Concrete of Diversion Tunnel of Xiluodu Hydropower Station that Pouring Concrete by Stage in Summer[J].Water Resources and Power,2013,31(03):90-93+138.DOI:10.20040/j.cnki.1000-7709.2013.03.024.
2013-03-25
2013-03-25