The construction of pumped storage power station involves many complicated processes such as civil construction, installation of mechanical and electrical equipment and resource scheduling, which make the traditional construction schedule management method difficult to cope with. In order to improve the intelligent level of construction schedule management and solve the shortcomings of traditional methods, this study proposed a construction schedule collaborative management system based on building information model(BIM) and geographic information system(GIS), and genetic algorithm was used to optimize construction scheduling. Through experimental verification, IGA can significantly optimize the construction schedule, reduce the construction period by 10.5%-12.4%, improve the convergence speed, and reduce the calculation time by 15%-20%. The construction progress visualization system can accurately reflect the construction progress in different construction stages, and the progress deviation is controlled within the range of 1.9% to 10.1%, and the BIM and GIS data synchronization error can be at least 1.2 seconds. The research shows that BIM+GIS collaborative management system combined with optimized scheduling algorithm and visualization technology can effectively improve the intelligent level of construction schedule management, which provides technical support for efficient construction of large-scale projects.
[1] 王凯,王洋,杜鹏,等.抽水蓄能电站工程基建施工用电智能管控技术应用[J].电网与清洁能源,2023,39(6):144-150.(WANG K,WANG Y,DU P,et al.Application of intelligent electricity control technology in the construction of the pumped storage power station[J].Power system and clean energy,2023,39(6):144-150.(in Chinese))
[2] ZHOU R Y.Research on construction technology of steel bifurcation for diversion system in pumped storage power station under complex conditions[J].American journal of water science and engineering,2024,10(1):1-7.
[3] 白宇,刘洁,王欣南.基于BIM的施工进度精细化管控方法研究与实践[J].公路,2023,68(4):267-274.(BAI Y,LIU J,WANG X N.Research and practice of fine management and control method of construction progress based on BIM[J].Highway,2023,68(4):267-274.(in Chinese))
[4] XU S Q,LI X J,LIU Q,et al.Intelligent monitoring system for environmental protection during the construction period of pumped storage power station[J].Cluster computing,2024,28(2):100.
[5] HUANG L,ZUO S Y,YU B,et al.Multi-objective optimization and simulation of earthwork equipment configuration in the upper reservoir of a pumped storage power station[J].Canadian journal of civil engineering,2025,52(2):133-143.
[6] 阮尔潮.探讨水利水电工程施工中施工进度控制与调度策略研究[J].中国地名,2024(2):79-81.(RUAN E C.Discussion on construction schedule control and scheduling strategy in water conservancy and hydropower project construction[J].China place name,2024(2):79-81.(in Chinese))
[7] 施炎,黄灿新,王团乐,等.基于GIM的水利水电灌浆工程三维可视化分析方法与应用[J].长江科学院院报,2022,39(8):133-139.(SHI Y,HUANG C X,WANG T L,et al.Three-dimensional visualization of grouting for water conservancy and hydropower project based on GIM:Analysis method and application[J].Journal of Changjiang River Scientific Research Institute,2022,39(8):133-139.(in Chinese))
[8] 段斌,丁新潮,周相,等.大型复杂水电工程BIM技术数字化研究与实践[J].水电能源科学,2023,41(5):187-189,108.(DUAN B,DING X C,ZHOU X,et al.Practice of digitalization of BIM technology in large and complex hydropower projects[J].Water resources and power,2023,41(5):187-189,108.(in Chinese))
[9] 谢存仁,徐峰,阮敏浩.基于BIM与遗传算法的建筑工程施工进度多目标优化研究[J].工程管理学报,2021,35(3):117-122.(XIE C R,XU F,RUAN M H.Study on multi-objective optimization of construction schedule based on BIM and genetic algorithm[J].Journal of engineering management,2021,35(3):117-122.(in Chinese))
[10] 卜朱镇,梁晓蓓,孟虎.基于多项目重要度的关键链识别改进方法及应用[J].工业工程与管理,2021,26(5):187-194.(BU Z Z,LIANG X B,MENG H.Improved method and application of critical chain identification based on multi-project important degree[J].Industrial engineering and management,2021,26(5):187-194.(in Chinese))
[11] 周国华,潘泽龙,魏强,等.铁路工程施工进度计划模型及其算法优化方法[J].工业工程与管理,2023,28(3):145-155.(ZHOU G H,PAN Z L,WEI Q,et al.Railway engineering construction schedule planning model and its algorithm optimization method[J].Industrial engineering and management,2023,28(3):145-155.(in Chinese))
[12] 章朝奔,张善从.基于数字型设计结构矩阵-遗传算法的项目管理方法研究[J].科技管理研究,2021,41(18):192-204.(ZHANG C B,ZHANG S C.Research on project management method based on RDSM-GA[J].Science and technology management research,2021,41(18):192-204.(in Chinese))
Basic Information:
DOI:10.20040/j.cnki.1000-7709.2026.20250717
China Classification Code:TV511;TV743
Citation Information:
[1]YANG Dong-bo.Application Research of Construction Schedule Collaborative Management of Pumped Storage Power Station Based on BIM+GIS[J].Water Resources and Power,2026,44(03):20-24.DOI:10.20040/j.cnki.1000-7709.2026.20250717.
2025-04-18
2025
2026-01-07
2025-06-05
2025
1
2026-01-29
2026-01-29
2026-01-29