nav emailalert searchbtn searchbox tablepage yinyongbenwen piczone journalimg journalInfo journalinfonormal searchdiv searchzone qikanlogo popupnotification paper paperNew
2023, 10, v.41 58-61
Comprehensive Analysis of Flood Discharge Hydraulics Prototype Observation of Danjiangkou Dam Heightening Project
Email:
DOI: 10.20040/j.cnki.1000-7709.2023.20230066
Abstract:

Danjiangkou Dam is a control project for the development and protection of the Hanjiang River basin, and is also a water source project for the Middle Route Project of the South-to-North Water Transfer Project. The dam operation safety is the support and guarantee of the national strategy. After the dam heightening, the operating water head will increase, and there may be cavitation, and the downstream scour pit will move upward during the flood discharge process. In order to master the mechanical characteristics of flood discharge after heightening the dam and evaluate the safety of flood discharge structures, the parameters such as bottom flow velocity, dynamic water pressure, flow cavitation noise, and scouring under the dam are mainly observed by means of field hydraulic prototype observation, and the results of previous studies are analyzed. The observation parameters under the design water level are within the safe range. Aiming at the problem that the water tongue of the surface hole impacts the middle wall, the opening order of the flood discharge orifice is optimized. The causes of the scour holes in the flow channel and side wall after the flood season are analyzed and the treatment suggestions are put forward. The problems found and treatment measures can provide reference for similar projects.

Basic Information:

DOI:10.20040/j.cnki.1000-7709.2023.20230066

China Classification Code:TV135.2

Citation Information:

[1]ZHOU Rong,LIU Sheng-fan,YANG Hai-cong.Comprehensive Analysis of Flood Discharge Hydraulics Prototype Observation of Danjiangkou Dam Heightening Project[J].Water Resources and Power,2023,41(10):58-61.DOI:10.20040/j.cnki.1000-7709.2023.20230066.

Received:  

2023-01-13

Received Year:  

2023

Accepted:  

2023-02-14

Accepted Year:  

2023

Revised:  

2023-09-12

Review Duration(Year):  

1

Published:  

2023-10-25

Publication Date:  

2023-10-25

quote

GB/T 7714-2015
MLA
APA
Search Advanced Search