nav emailalert searchbtn searchbox tablepage yinyongbenwen piczone journalimg journalInfo journalinfonormal searchdiv searchzone qikanlogo popupnotification paper paperNew
2015, 09, v.33 128-131+142
Application of Relay Chain Technology in Third-stage of Three Gorges Project
Email:
DOI: 10.20040/j.cnki.1000-7709.2015.09.032
Published:   2015-09-25
Publication Date:   2015-09-25
Mobile reading
Abstract:

In order to introduce the application of relay chain technology in the third-stage of the TGP,the construction of relay chain operation mechanism was elaborated.Relay chain operation processes were analyzed from the aspects of operating mechanism,guarantee mechanism,rapid response mechanism and restriction mechanism.And then the application effects of the relay chain technology in the third-stage of the TGP were presented.The practice results show that the relay chain technology can make interchange of working process smoothly,realize optimization allocation of resources,and raise the project quality on the premise of ensuring construction period.The research results are beneficial to application of relay chain technology in rapid construction of concrete dam with high quality,which can produce no crack dam.

Basic Information:

DOI:10.20040/j.cnki.1000-7709.2015.09.032

China Classification Code:TV51

Citation Information:

[1]WANG Bo,GAO Jun-yan,ZHOU Hou-gui.Application of Relay Chain Technology in Third-stage of Three Gorges Project[J].Water Resources and Power,2015,33(09):128-131+142.DOI:10.20040/j.cnki.1000-7709.2015.09.032.

Fund Information:

中国葛洲坝集团三峡建设工程有限公司科研资助项目(2013KJ-01)

Published:  

2015-09-25

Publication Date:  

2015-09-25

quote

GB/T 7714-2015
MLA
APA
Search Advanced Search